Some of the men responsible for the Rover P4
Production: Mr. W. J. Robinson
Body Assembly: Mr. R. Dribble
Paint job: Mr. J. Alford.
Trim: Mr. P. W. Hall.
Electrics: Mr. S. Smith.
Chassis Assembly: The late Mr. J. McCutchton,
Finishing Line Foreman: Mr. L Barrow.
Quality Control and Inspection: Mr. C. T. Newsom.
Stores and Material Control: Mr. F. W. Allen.
Works Manager, Tyseley Factories: Mr. A. J. Worster.
Production Manager: Mr. F. C. Holland.
Assembly Superintendent: Mr H. E. Davenport